Filters
Question type

Study Flashcards

When performing a time study,"normal time" is calculated by converting the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?


A) Allowance factors
B) Methods-time measurements (MTM)
C) Methods analysis
D) Performance ratings
E) Summing basic elementary motions

F) C) and D)
G) D) and E)

Correct Answer

verifed

verified

Methods analysis techniques do not directly consider behavioural aspects of jobs.

A) True
B) False

Correct Answer

verifed

verified

The technique which can be used to estimate the percentage of time a worker or a piece of equipment is idle is:


A) MTM.
B) work sampling.
C) methods analysis.
D) micro-motion study.
E) none of these.

F) B) and C)
G) All of the above

Correct Answer

verifed

verified

A Methods and Measurements Analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse.In a preliminary study,she observed one of her employees perform this task six times with the following results: A Methods and Measurements Analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse.In a preliminary study,she observed one of her employees perform this task six times with the following results:   What is the standard time (ST) for this task if the employee worked at a 20% faster pace than is average and an allowance of 25% of job time is used? A) 40 seconds B) 50 seconds C) 53.3 seconds D) 60 seconds E) 64 seconds What is the standard time (ST) for this task if the employee worked at a 20% faster pace than is average and an allowance of 25% of job time is used?


A) 40 seconds
B) 50 seconds
C) 53.3 seconds
D) 60 seconds
E) 64 seconds

F) A) and E)
G) B) and D)

Correct Answer

verifed

verified

"Self-directed teams" are formed to give them broad authority to make decisions concerning all issues in the organization that have an impact on their work unit.

A) True
B) False

Correct Answer

verifed

verified

Standard times are determined by taking the average time one worker takes to complete the same task many times.

A) True
B) False

Correct Answer

verifed

verified

The manager of Lawn and Garden Services would like to estimate the proportion of her employees' times spent performing various gardening or lawn care activities.She has made 400 random observations of a typical worker,with the following results: The manager of Lawn and Garden Services would like to estimate the proportion of her employees' times spent performing various gardening or lawn care activities.She has made 400 random observations of a typical worker,with the following results:   What is the probability that the true proportion of time spent mowing is exactly equal to the sample proportion? A) 0 B) 1 C) 2 D) 5 E) 1. What is the probability that the true proportion of time spent mowing is exactly equal to the sample proportion?


A) 0
B) 1
C) 2
D) 5
E) 1.

F) A) and B)
G) All of the above

Correct Answer

verifed

verified

Which of the following plans is based on compensation of an employee for being an employee?


A) commission
B) salary
C) Time-based
D) wage
E) Skills/knowledge

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

The owner of Kat Motel wants to develop a time standard for the task of cleaning a cat cage.In a preliminary study,she observed one of her employees perform this task six times,with the following results: The owner of Kat Motel wants to develop a time standard for the task of cleaning a cat cage.In a preliminary study,she observed one of her employees perform this task six times,with the following results:   What is the observed time (OT) for this task? A) 81 seconds B) 90 seconds C) 99 seconds D) 108 seconds E) 540 seconds What is the observed time (OT) for this task?


A) 81 seconds
B) 90 seconds
C) 99 seconds
D) 108 seconds
E) 540 seconds

F) None of the above
G) A) and B)

Correct Answer

verifed

verified

Work sampling involves the use of some method of randomizing the observations.

A) True
B) False

Correct Answer

verifed

verified

Minimum wage legislation makes piece-rate compensation plans somewhat challenging to implement.

A) True
B) False

Correct Answer

verifed

verified

Job enrichment involves an increase in the level of employee responsibility for planning,execution,and control of a job.

A) True
B) False

Correct Answer

verifed

verified

The manager of Lawn and Garden Services would like to estimate the proportion of her employees' times spent performing various gardening or lawn care activities.She has made 400 random observations of a typical worker,with the following results: The manager of Lawn and Garden Services would like to estimate the proportion of her employees' times spent performing various gardening or lawn care activities.She has made 400 random observations of a typical worker,with the following results:   What is the most likely true proportion of time spent mowing? A) 0 B) 1 C) 2 D) 5 E) 1. What is the most likely true proportion of time spent mowing?


A) 0
B) 1
C) 2
D) 5
E) 1.

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

Methods analysis focuses on how a job can be made more efficient.

A) True
B) False

Correct Answer

verifed

verified

Focusing on how a job is done and attempting to make it more efficient describes:


A) work measurement.
B) Gantt charts.
C) methods analysis.
D) job evaluation.
E) job enlargement.

F) A) and B)
G) All of the above

Correct Answer

verifed

verified

The methods analysis chart which describes the movements of both hands at the same time is a(n) :


A) process chart.
B) worker-machine chart.
C) gang process chart.
D) simultaneous motion (simo) chart.
E) efficiency/time-of-day chart.

F) C) and E)
G) B) and D)

Correct Answer

verifed

verified

The owner of Touchdown Sports Bar wants to develop a time standard for the task of mixing a specialty cocktail.In a preliminary study,he observed one of his bartenders perform this task seven times with an average of 90 seconds and a standard deviation of 5 seconds. What is the standard time (ST) for this task if the bartender worked at a twenty percent faster pace than is average,and an allowance of twenty percent of the workday is used?


A) 112.5 seconds
B) 120 seconds
C) 135 seconds
D) 144 seconds
E) 150 seconds

F) C) and E)
G) All of the above

Correct Answer

verifed

verified

A worker-machine process chart is helpful to visualize portions of a work cycle during which an operator and equipment are busy or idle.

A) True
B) False

Correct Answer

verifed

verified

The primary objective of work/job design is to improve efficiency.

A) True
B) False

Correct Answer

verifed

verified

The focus of the efficiency approach to work/job design is to improve quality of work life and employee empowerment.

A) True
B) False

Correct Answer

verifed

verified

Showing 101 - 120 of 147

Related Exams

Show Answer